Material requirements planning (MRP) is one of the most important functions in an ERP system but is also very performance-intensive. Depending on the size and complexity of the company and the production processes, it can take several hours. For this reason, the MRP is traditionally planned as an overnight job. Many companies would therefore like to have data that is more up-to-date but are bound by technical restrictions.

With the HANA database, SAP has created the conditions for eliminating this bottleneck – or, at least, improving it. In this respect, SAP promises significantly faster speeds with the new MRP Live functionality, so that the MRP can be scheduled to take place several times a day.

MRP Live: flexible and rapid material requirements planning via in-memory technology

In SAP HANA, SAP has developed a new form of material requirements planning which is known as MRP Live and/or MRP Live on HANA. In technical terms, think of MRP Live as the following: the request to carry out the material requirements planning is sent in one piece to the main storage, where the calculation then takes place and is transferred back in one piece. It is possible to save considerable amounts of time by using this in-memory technology. However, you will also notice that the time saved for certain materials cannot be measured or is very small. MRP Live therefore only shows its strengths with very large quantities of data. The planning run can be structured more easily with MRP Live. That means, for example, that a group of materials can be planned: one material across every plant, or all materials for one MRP controller. Conventional material requirements planning is still available.

MRP Live also has various functions which are not immediately evident. For example, materials that MRP Live is unable to plan are forwarded to the conventional MRP and are planned there (e.g. scheduling of materials at the point of order). Secondly, MRP Live forwards materials for which PP/DS is activated to the master planning process in PP/DS. The limitations MRP Live has are highly dependent on its release and patch level; to that end, SAP has created the OSS note 1914010, which is regularly updated.

MRP Live differs from the conventional MRP in the following ways:

  • MRP Live does not write any scheduling lists.
  • The multi-level individual customer requirements planning (transaction MD50) is not optimised for SAP HANA.
  • The individual project requirements planning (transaction MD51) is not optimised for SAP HANA.
  • The creation indicator for purchase requisitions is unavailable in MRP Live. MRP Live always creates purchase requisitions if the material has been procured externally.
  • The creation indicator for delivery schedules is unavailable in MRP Live. MRP Live always creates delivery schedules if a valid delivery schedule is available.

MRP lists were formerly a work tool for the MRP controller and a tool for circumventing performance problems. On the one hand, performance problems are no longer an issue inSAP S/4HANA. On the other hand, newer tools have been created for the MRP controller so that they can check and edit their scheduling using SAP Fiori apps. The adjustment regarding the creation indicator is the biggest obvious change. SAP justified this by saying that working methods in companies have changed and that the separation between the MRP controllers and buyers no longer exists. Even if that is partly true, it certainly can’t be generalized. In this context, customers must either live with the changed functions or restore the old logic using BAdIs.

In addition to the above constraints, there are others, such as stochastic materials planning. We see that these can certainly be planned with MRP Live, but in the background, MRP Live passes the planning on to the classic MRP where the planning takes place. This method can also be used by entering materials in the transaction MD_MRP_FORCE_CLASSIC, for example, to continue using the old BAdIs. Via the same transaction, it is also clear as to which materials have been planned with the standard MRP, with MRP Live or even with PP/DS.

“Determining material coverage” as part of SAP® Smart Business

As MRP Live no longer supports MRP lists, the question arises as to how the MRP controller now works. In this respect, SAP has created a series of new Fiori apps that support the MRP controllers and even offer simulation capabilities.

It is certainly the case that one of the key Fiori apps is “Determine material coverage”. This can be roughly compared with the MRP list, but with current data. In this list, with the correct filter settings, you can see all the materials shortages for which the MRP controller is responsible, i.e. those for which the MRP controller is required to take action.

MRP Live under SAP S/4HANA - PIKON SAP Beratung (3)

From here, it is possible to access and view the material coverage. At this point, experienced users of SAP will recognize the stock/requirement list.

MRP Live under SAP S/4HANA - PIKON SAP Beratung (4)

Until now many will feel nothing is new, it is only more colourful. It is possible to analyse the situation regarding the material shortage in these apps. SAP offers simulation options on how to resolve those shortages as well.

MRP Live under SAP S/4HANA - PIKON SAP Beratung (5)

If this is not sufficiently colourful, you can also edit this graphically and see when and how the shortfall can be resolved.

MRP Live under SAP S/4HANA - PIKON SAP Beratung (6)

In summary, with MRP Live, SAP has developed a powerful tool for material requirements planning under S/4HANA which breaks new ground in terms of both performance and usability.

Do you have any additional questions? Request a free, non-binding consultation and share your ideas with our material requirements planning expert!

Arrange your personal appointment with our SAP logistics experts

Expert on material requirements planning in SAP S/4HANA

MRP Live under SAP S/4HANA - PIKON SAP Beratung (7)

Martina Ksinsik

Customer Success Manager

+49 (0) 681 379 62 - 113

martina.ksinsik@pikon.com

Make an appointment now

ERPLogisticsPlanningSAP S/4HANA

Share this Post

About the author

MRP Live under SAP S/4HANA - PIKON SAP Beratung (8)

Jürgen Neubronner

I am a Principal SAP ERP Consultant at PIKON Deutschland AG and have already implemented different SAP S/4HANA projects at international customers in the machinery and plant engineering industry. My focus is designing and implementing logistics processes, in particular with SAP S/4HANA Manufacturing, SAP S/4HANA Supply Chain and SAP S/4HANA Sourcing & Procurement.

Show all posts by Jürgen Neubronner

Leave a Comment

More Blog-Posts

MRP Live under SAP S/4HANA - PIKON SAP Beratung (9)

  • By Muheb Al Najjar

MRP Live under SAP S/4HANA - PIKON SAP Beratung (10)

SAP S/4HANA Cloud: Public Edition vs. Private Edition

Learn about the potential of the various cloud versions for the SAP S/4HANA system.

  • 8 Minutes

Read more

MRP Live under SAP S/4HANA - PIKON SAP Beratung (11)

  • By Sarah Leichtweis

MRP Live under SAP S/4HANA - PIKON SAP Beratung (12)

Our step-by-step guide to your SAP S/4HANA brownfield migration

Here is the guideline with the necessary steps in the individual phases for a brownfield migration.

  • 8 Minutes

Read more

MRP Live under SAP S/4HANA - PIKON SAP Beratung (13)

  • By Maximilian Ulrich

MRP Live under SAP S/4HANA - PIKON SAP Beratung (14)

Preliminary procurement for projects using SAP PS in S/4HANA or SAP ECC

Early procurement of critical components or assemblies with the SAP Project System module.

  • 6 Minutes

Read more

MRP Live under SAP S/4HANA - PIKON SAP Beratung (15)

  • By Oliver Dworschak

MRP Live under SAP S/4HANA - PIKON SAP Beratung (16)

S/4HANA Embedded Analytics: Success with real-time decisions!

Benefits and functionality of SAP S/4HANA Embedded Analytics.

  • 8 Minutes

Read more

MRP Live under SAP S/4HANA - PIKON SAP Beratung (17)

  • By Tina Erke-Winter

MRP Live under SAP S/4HANA - PIKON SAP Beratung (18)

Do you already know the potential of modern planning?

Which modern planning approach suits your company? We explain the advantages and disadvantages.

  • 9 Minutes

Read more

MRP Live under SAP S/4HANA - PIKON SAP Beratung (19)

  • By Ben Groß

MRP Live under SAP S/4HANA - PIKON SAP Beratung (20)

Warehouse Management or Stock Room Management in SAP

How to design your warehouse management efficiently in both SAP ECC and SAP S/4HANA

  • 9 Minutes

Read more

MRP Live under SAP S/4HANA - PIKON SAP Beratung (21)

  • By Tanja Nikolaus

MRP Live under SAP S/4HANA - PIKON SAP Beratung (22)

Your Roadmap for the SAP S/4HANA Migration

Areas to consider for your SAP S/4HANA project.

  • 10 Minutes

Read more

MRP Live under SAP S/4HANA - PIKON SAP Beratung (23)

  • By Muheb Al Najjar

MRP Live under SAP S/4HANA - PIKON SAP Beratung (24)

Advanced Intercompany Sales and Stock Transfer in SAP S/4HANA

Optimize your intercompany processes efficiently under S/4HANA!

  • 7 Minutes

Read more

MRP Live under SAP S/4HANA - PIKON SAP Beratung (25)

  • By Sabine Hofmann

MRP Live under SAP S/4HANA - PIKON SAP Beratung (26)

SAP S/4HANA Overview: Your Guide for the Upcoming Migration

Everything you need to know about SAP S/4HANA in a summerized form.

  • 7 Minutes

Read more

MRP Live under SAP S/4HANA - PIKON SAP Beratung (27)

  • By Khalid Abid

MRP Live under SAP S/4HANA - PIKON SAP Beratung (28)

New features in down payment processing with S/4HANA

Optimise the process of "sales contract management" by adding down payment processing

  • 4 Minutes

Read more

MRP Live under SAP S/4HANA - PIKON SAP Beratung (29)

  • By Jörg Hofmann

MRP Live under SAP S/4HANA - PIKON SAP Beratung (30)

Myths in ERP projects: From functional specification to go-live

Various myths surround the implementation of S/4HANA. We check the facts for you.

  • 11 Minutes

Read more

MRP Live under SAP S/4HANA - PIKON SAP Beratung (31)

  • By Tobias Haßdenteufel

MRP Live under SAP S/4HANA - PIKON SAP Beratung (32)

Why data literacy is essential for your company

What is data literacy, and how can it be established successfully in your company?

  • 13 Minutes

Read more

This website uses cookies which are necessary for the technical operation of the website and are always set. Other cookies which increase the usability of this website, used to serve direct advertising or simplify interaction with other websites and social networks will only be used with your consent. If you are under 16 and wish to give consent to optional services, you must ask your legal guardians for permission. We use cookies and other technologies on our website. Some of them are essential, while others help us to improve this website and your experience. Personal data may be processed (e.g. IP addresses), for example for personalized ads and content or ad and content measurement. You can find more information about the use of your data in our privacy policy. You can revoke or adjust your selection at any time under Settings.

MRP Live under SAP S/4HANA - PIKON SAP Beratung (2024)
Top Articles
Latest Posts
Article information

Author: Tish Haag

Last Updated:

Views: 5538

Rating: 4.7 / 5 (47 voted)

Reviews: 86% of readers found this page helpful

Author information

Name: Tish Haag

Birthday: 1999-11-18

Address: 30256 Tara Expressway, Kutchburgh, VT 92892-0078

Phone: +4215847628708

Job: Internal Consulting Engineer

Hobby: Roller skating, Roller skating, Kayaking, Flying, Graffiti, Ghost hunting, scrapbook

Introduction: My name is Tish Haag, I am a excited, delightful, curious, beautiful, agreeable, enchanting, fancy person who loves writing and wants to share my knowledge and understanding with you.