Project Management Fees | Hourly & Consulting Rates (2024)

Everything You Need to Know: What’s the Best and Average Project Manager Hourly Rate? What are Typical Project Management Fees?

If you’re planning to go into project management either as a full-time employee with a firm or as a consultant, how much can you expect to make? If you are an employer, HR, or hiring manager, how much should you pay your project managers?

In this article, we’ll give you complete answers to the following:

  • Project management consulting rates
  • Typical project management fees
  • Types of project management fee structure options
  • Average project manager hourly rate
  • Example of a project management fee scale

Project Management Fees | Hourly & Consulting Rates (1)

Average Project Management Fees – Percentage, Hourly Rate, Salary

Wondering what to pay for an hourly rate for project manager consultants? Interested in a full-time project management job and wondering about average salaries? Interviewing for a consulting position and want to know the average project management consultant salary?

Read on for those answers and more!

See Also:

Free Change Management Templates

Get Your Free Change Management Templates Today

Trends in Project Management Job Function

Few job roles can contribute as widely to an organization’s productivity as a project manager. The Project Management Institute (PMI) notes that 93% of organizations state they use standardized project management practices.

For any type of project to run smoothly, it needs expert planning and execution, and that’s the role of the product manager.

Not only is this a lucrative career, with the hourly rate for project manager consultants increasing over the last year (per 2020 DPM Salary Survey), there is a growing gap between the need for skilled project management professionals and the number of people available to fill that role.

This gap will continue to increase project management consulting fees and contribute to the role of project manager being a very promising career path.

1-on-1 Change Manager Coaching

Increase Your Change Management Successes & Expertise.

Project Management Fees | Hourly & Consulting Rates (3)

Have you been assigned to a change management project?

Get the best change management coaching. Discuss your plans and ensure you have not missed anything before delivering them to your stakeholders. Increase your change successes.

Safe environment. 1-on-1 change coaching. No question is too small. Ask me anything.

Find Out More | Schedule Your First Free Call

Project Management Consultant Job Description

The project management consultant job description can be varied according to the type of project being undertaken. Some projects involve large scale construction, in which case a project manager needs to understand how to coordinate various contractors.

Other projects are more digital in nature, requiring some expertise in business technology in the project management consultant job description.

Overall, a project manager for any type of project needs to have the following traits.

Excellent Communications

Project managers are coordinating with multiple people to get a project planned and executed on time and budget. This requires them to be excellent communicators that possess the ability to clearly and coherently state objectives and instructions, and follow up continually.

Leadership Skills

Included in project management consulting fees is the understanding that the project manager is going to handle all aspects of a project and see it through to fruition. This required leadership skills and an attitude that “the buck stops here.”

Organizational Skills

Projects have multiple moving parts from the initial planning and analysis phase by ensuring all people being impacted by a project are properly trained. Superior organizational skills are a given in any project manager or project management consultant job description.

Example: Project Management Consultant Job Description from Indeed

We reviewed the job search engine Indeed to find an example of a project management consultant job description in a live job posting.

Project manager job responsibilities:

  • Provide input to and update program roadmaps
  • Develop and maintain processes for managing intake, prioritization, planning execution
  • Demonstrate measurable progress toward KPIs and delivery of work
  • Understand basic financial models, P/L, and cost-to-completion projections
  • Manage day-to-day operational aspects of multiple projects
  • Report findings by creating useful and appropriate data outputs and visualizations
  • Hold teams accountable to make and meet commitments
  • Track program schedule, budget, quality, and risks
  • Utilize change management techniques and processes

Experience/Education Qualifications

A review of a variety of project management consultant job description listings showed that companies typically ask for 1-3 years of past project management experience for standard project management positions.

For more senior positions, you may see requests of at least 8+ years of project management experience required.

Some project management consultant job descriptions will ask for a bachelor’s degree, but others are more interested in the skills a project management candidate has, such as Excel or technology skills.

You’ll also find that certain job postings request PMP® certification or another type of project management certification.

Don’t Miss:Types of Organizational Change Management

FREE Change Management Templates (Excel, PDF, PPT)

Get Free Templates Today

Get Your Free Change Management Templates Today

What is a Project Fee?

A project fee is generally the cost paid by an organization for project management services.

Project fees are related to projects where an ongoing project management consultant salary isn’t being paid to an employee, and instead, a company is paying a fee for a project management consultant.

Project management consulting rates can vary according to the project needs, the expertise required, and the overall scope and timeline of a project.

The project management fees percentage or flat rate fee that is charged does not typically include costs for project materials, software, or other budgetary needs. Rather, it’s the direct compensation to the project management consultant.

In the case of additional expenses, like travel or hotel costs, a project management consultant may fold those costs into their overall project manager hourly rate or flat rate fee, or they may bill for them separately.

How Do You Charge Project Management Fees?

If you’re a project management consultant, or interested in becoming one, you’ll want to decide exactly how you’re going to set up your project management fee structure.

There are different approaches you can use, and you may use more than one type of project management fee scale, depending upon the type of project you’re being hired to head up.

Here are some of the standard ways to charge project management consulting rates.

Hourly Fee

Hourly project management rates are typically done if you are unsure how long a project is going to take or if the scope of the project could potentially change.

An hourly rate for project manager consultants is also often used for smaller projects, where charging a percentage of the overall project cost would not make sense.

Flat Fee

A flat fee for an entire project is typically desirable for the client if they have a large-scale project because it allows them to know exactly what they’ll be paying and they can budget accordingly.

For a flat fee project management fee structure, a project manager consultant needs to accurately estimate their time and expense for managing the project so they can be sure they won’t end up making less than they expect.

It’s helpful to include a contingency in any project management fee scale agreement that includes additional compensation if the project scope or timeline is changed.

Project Management Fees | Hourly & Consulting Rates (6)

Project Manager Hourly Rate & Typical Salary

Percentage of Project

A popular fee structure for large projects and projects that can easily change in scope or timeline is charging a project management fee percentage.

Charging your project management consultant salary as a percentage of the overall project cost can ensure a fair rate if the project changes to require more oversight or a longer time commitment.

The project management fees percentage format is a standard used for construction projects.

Day Rate

Rather than charging a project manager hourly rate, a consultant can choose to charge a day rate for project management services.

This will also typically be done for smaller projects or as an add-on to flat fee contracts as a contingency for changes to the project that require more time than agreed upon.

Milestone Payments

With any of the project management fee structure options above, a project manager can also request milestone payments, so they’re not waiting until a project is completely finished before being paid.

This is often done for larger, longer-term projects. Milestones will be built in during the project planning phase, and once reached will result in a certain percentage of the overall project management consulting fees being paid.

Related: Business Change Manager | All You Need to Know

What’s an Average Project Management Hourly Rate?

AGS has reviewed multiple resources to bring you the most accurate information on the project manager’s hourly rate.

It’s important to note that project management consulting rates can vary according to several criteria, including:

  • Expertise type needed for a project
  • Timeline, budget, and scope of the project
  • Whether or not the consultant is certified in project management
  • Experience level of the project management consultant
  • Geographical location of the project

Salary.com

According to Salary.com, the average hourly rate for project manager consultants is between $59 to $74 per hour, with the median hourly wage being $66.00.

Upwork

On the freelancer site Upwork, the project manager hourly rate charged by consultants varies widely and is between $30 – $155 per hour.

Business 2 Community

According to Business 2 Community, the typical project management consulting fees by experience are:

  • Basic Project Management: $30 – $60 per hour
  • Intermediate Project Management: $60 – $100 per hour
  • Certified PM Practitioners: $100 – $150 per hour

We’ve averaged the various sources above to give you a good idea of the hourly rate for project manager consultants that you can charge if you’re a consultant or expect to pay if you’re hiring one.

The average project manager hourly rate is

$56.00 to $108.00 per hour.

Example Project Management Fee Scale

When it comes to your scale for project management fees percentage, how detailed you get with your fee structure will depend upon the types of projects you typically work with.

For example, the typical project management fees for small and mid-sized projects will differ widely from large-scale construction projects or multi-location technology upgrade projects.

Whether you’re charging a project manager hourly rate or using a project management fee scale by percentage, you need to begin with an idea of the types of projects you plan to work on.

Smaller Projects – Project Management Fee Scale

If you’re working on projects that are smaller in size and cost, such as $5,000,000 and under, then you may only need to provide two or three percentage levels based upon project size.

According to Home Advisor, the average project management fees for construction project management are:

5 – 15% of the total price for small projects (less than $500,000)

5% or less for large-scale projects ($500,000 to $5 million and higher)

Larger Projects – Project Management Fee Scale

When you’re working with large scale projects, especially those connected to education or government, you’ll often find that they have pre-approved standard project management consulting fees that consultants must agree to.

These board-approved fee schedules are typically tied to construction projects; however, they can give you a general guide for creating your own project management consulting rates by percentage for large projects.

We’ve reviewed several university project management fee schedules, and here is a typical project management fee scale by the percentage of project cost:

Project Management Fees | Hourly & Consulting Rates (8)

What’s an Average Project Management Consultant Salary?

Project management consultants can choose several ways to enter this career path.

They can work for a company that provides project management services to other organizations. Or they may be hired and paid a project management consultant salary by a large organization that has project managers on staff.

The third option is to freelance and have a project management consulting business. In this case, a project manager consultant will need to factor in their business costs, self-employment taxes, etc. into the annual project management consultant salary they make.

Here are the average salary amounts you can expect to make in your role as a project manager.

Salary.com

According to Salary.com, the range of a project management consultant salary is $66,591 – $88,774 per year, with the median at $76,115 annually.

Glassdoor

Glassdoor lists an average project management consultant salary ranging from $71,000 to $138,000 annually. The average base pay for the project management consultant job description is $100,235 per year.

Digital Project Manager Salary Survey Results

The Digital Project Manager took a survey of hundreds of participants from around the world to come up with average project management consultant salary data.

Here are their findings in a few different countries on what project management fees earn for consultants in annual salary:

  • USA Project Management Consultant Salary: $32,000 – $210,000/year
  • UK Project Management Consultant Salary: ₤21,620 – ₤117,000/year
  • Canada Project Management Consultant Salary: $40,000 – $110,000 CAD/year

Average salaries for project managers in each country:

  • USA: $76,632
  • UK: ₤39,468
  • Canada: $68,869 CAD

We’ve averaged these varied resources to learn the standard project management consultant salary. If you’re working in this career field, you can expect to make:

Average salary for project management consulting of

$72,714 to $95,000 per year

Popular Article:Best Change Management Jobs

Conclusion | Typical Project Management Fees, Rates, and Salary

Based upon today’s current demand for project managers and the gap between that need and the number of qualified project managers available, the project manager hourly rate and salary will continue rising.

This is also a field that has plenty of room for growth and the ability to get in without a college degree and instead leverage things like technology knowledge and a project management certification.

In fact, with a PMP® certification, you can demand a higher project manager hourly rate or project fee. And as in most fields, the more experience you have the higher your project management consulting salary prospects.

We hope this AGS insight article on a typical project management fee scale, project manager hourly rate, and average salary for project management consultants has given you insight into what to expect when entering this career field or when hiring a project management consultant.

How much does a project manager make per project?

For large projects, a project management consultant will typically charge a percentage of the total project cost for the project management fee. A project that is $2,000,000 in total cost, will have an average consultant fee of 3.50%, which would be $70,000. An hourly rate for project manager consultants averages $56.00 to $108.00 per hour.

Do project managers get paid well?

The average project management consultant salary, according to an average of data from Salary.com, Glassdoor, and the 2020-2021 DPM survey of project managers is between $72,714 to $95,000 per year.

What is included in project management fees?

Each consultant can decide what to include in their project management fee scale. The project management fee will typically be the consultant’s payment for their services and additionally may include incidentals such as travel, hotel, or other expenses.

Should I charge per hour or per project?

Project management consultants will usually charge by the hour for smaller projects or projects without a clear timeline. With larger projects, it’s standard to charge per project and base project management consulting fees on a percentage of the total project cost.

Authors:Ogbe Airiodion (Senior Change Management Lead) and Francesca Crolley (Content Manager) Note: Content on OCM Solution (Formerly Airiodion Global Services (AGS))'s ocmsolution.com website is copyrighted. If you have questions, comments, or tips about this OCM Solution (Formerly Airiodion Global Services) content or product, please contact OCM Solution today.

Free Change Management Templates

Get Your Free Change Management Templates Today

1-on-1 Change Manager Coaching

Increase Your Change Management Successes & Expertise.

Project Management Fees | Hourly & Consulting Rates (11)

Have you been assigned to a change management project?

Get the best change management coaching. Discuss your plans and ensure you have not missed anything before delivering them to your stakeholders. Increase your change successes.

Safe environment. 1-on-1 change coaching. No question is too small. Ask me anything.

Find Out More | Schedule Your First Free Call

FREE Change Management Templates (Excel, PDF, PPT)

Get Free Templates Today

Get Your Free Change Management Templates Today

All-in-One Change Management Tools.

Images: Microsoft 365 Clip Art Image(s) (Bing images licensed under the Creative Commons license system.), https://www.pexels.com/photo/crop-payroll-clerk-counting-money-while-sitting-at-table-4475523/, https://pixabay.com/illustrations/project-management-business-planning-2061635/

Project Management Fees | Hourly & Consulting Rates (2024)

FAQs

How do you explain project management fees? ›

A Project Management Fee (PM fee) is charged to generate funding to pay for expenses. This fee is based on a percentage of the total project cost minus the PM fees.

What percentage of project cost should be project management? ›

Based on the above estimates, the combined project management costs for all phases of a project total somewhere between 7–11 percent of the project's TIC. If project controls support is added, project management costs will be in the 9–15 percent range.

How do I work out my consulting rate? ›

How do I determine my consultancy fees?
  1. Determine your hourly rate based on your experience and industry standards. ...
  2. Estimate the time that will be spent on the project. ...
  3. Factor in additional consulting costs. ...
  4. Decide on a pricing model. ...
  5. Consider retainers.
13 Dec 2018

How much is a project management consultant? ›

₹283k/year to ₹3m/year is the project management consultant salary in India. The average salary for a project management consultant in India is ₹767,675/year.

What are the major types of costs in project management? ›

The 5 costs they cover are:
  • Direct cost.
  • Indirect cost.
  • Fixed cost.
  • Variable cost.
  • Sunk cost.

How many projects should a project manager manage? ›

The number of projects a project manager should manage typically ranges anywhere from three to 20 and depends on the employee's expertise and the complexity of the projects assigned.

What are the 4 main functions of cost management? ›

While cost management overall is a very complicated process and a critical project management knowledge area, we can break it down into four processes:
  • Resource planning. ...
  • Cost estimation. ...
  • Cost budget. ...
  • Cost control.
18 Mar 2022

What is one time cost in project management? ›

One Time Cost means first year cost which includes the cost of Supply, Design, Installation, Integration, Testing, Training and Implementation of Hardware, software, and any other required component of the proposed solution.

What is fee percentage? ›

Percentage Fee means a fee to be paid a firm which is based upon a negotiated percentage of the resultant construction contract. Sample 1Sample 2. Percentage Fee means 11 percent of the Lessee's Gross Revenues. Sample 1Sample 2.

What is a reasonable consulting rate? ›

Keep in mind, if the average consulting fees are around $100 per hour, your experience and track record will need to be taken into account. If you are a brand new consultant, you may be charging closer to $50 or $75 per hour. With 20 years of experience under your belt, you may be charging $150 or even $200 per hour.

What is a typical consulting rate? ›

Finding the market rates for your industry

Marketing consultants charge between $25 to $300 per hour, with $100 being the average. SEO specialists may be on the higher end of that range, while social media consultants are on the lower end, with brand strategists falling somewhere in the middle.

How do you negotiate consulting rates? ›

Let's get to it!
  1. Determine Your Minimum Acceptable Rate (MAR) Any freelancer should know where their bottom line is. ...
  2. Charge Per Project. ...
  3. Negotiate Based On Their Perception of Value. ...
  4. Get Them to Name a Price. ...
  5. Start High. ...
  6. Give Yourself Wiggle Room. ...
  7. Seek a Mutually Agreeable Outcome.

What is project management consulting? ›

A project management consultant provides expert project management advice to external businesses. A company may hire a project management consultant if it lacks project management expertise or needs project management advice from an external, impartial party.

How much do management consulting companies charge? ›

The hourly cost of consulting fees range from about $45 to $150 per hour.

How are consulting fees structured? ›

How do I determine my consultancy fees?
  1. Determine your hourly rate based on your experience and industry standards. ...
  2. Estimate the time that will be spent on the project. ...
  3. Factor in additional consulting costs. ...
  4. Decide on a pricing model. ...
  5. Consider retainers.
13 Dec 2018

What are the 4 types of cost? ›

Costs are broadly classified into four types: fixed cost, variable cost, direct cost, and indirect cost.

What should a project cost include? ›

The Project Direct Cost includes the cost of employees; equipment and materials; and outsourcing contractor's cost, etc., which are directly involved efforts or expenses: project management; engineering; procurement related cost such as transportation and custom clearance; construction management; construction labour; ...

What are the three types of cost estimates? ›

The three types of cost estimates are design, bid, and control estimates. Design estimates are prepared in the project preliminaries which gives the order of magnitude of the project cost.

How many hours should a project manager work? ›

Your working hours can vary depending on the project stage

These are not 40-hour weeks, but rather 45-to-50-hour weeks! Between those hectic phases, there will be more peaceful weeks where you can relax and close your computer early in order to have dinner with your loved one(s) or do other fun things.

Is project manager a stressful job? ›

Are you a stressed project manager? Not surprisingly, project management can be incredibly stressful. We're responsible for delivery on time, on budget and scope but often have to deal with limited or poorly equipped resources, unrealistic client expectations and a to-do list that could easily reach the moon and back.

How many projects can one person manage at a time? ›

Research suggests 2-3 projects at a time is optimal for individual focus and collective scheduling. If you're asking people to juggle more than this then you are lowering their productivity. Too Many Projects will damage your business and drive you into a self-perpetuating low productivity fire-fighting culture.

What is the first step in project cost management? ›

The very first step in any cost management process is resource planning, which is when the cost manager reviews the project's scope and specs to figure out what resources the project will require.

Who is responsible for cost management in a project? ›

Cost management is one of the most important responsibilities of a project manager; projects always need resources such as materials, labor and equipment, which generate costs. Those costs must be estimated and controlled throughout the project life cycle to complete the project.

What are the 5 strategies in cost control? ›

Cost Control: 5 Strategies to Consider
  • Get everyone involved. Challenge employees throughout the company to identify ways the business can save time or money. ...
  • Be greener. ...
  • Reduce your office footprint. ...
  • Work with interim professionals. ...
  • Challenge accounting and finance staff.
5 Mar 2015

Why is cost important in project management? ›

Effective cost control ensures that a project's budget is on track and the project is progressing and will be completed according to its planned scope. Without cost control, when taking on large-scale projects, a company can easily lose money as unrestrained costs exceed the project's profit.

Why is it important to measure project costs? ›

If Total Project Cost is not estimated precisely, the project will have to face serious consequences. It will have a direct impact on the project schedule, quality, and scope. This will lead to cost overrun.

How are transaction fees calculated? ›

This is calculated by dividing the total cost of all transactions by the total number of transactions. For example, if you had 100 transactions and your total cost was $1,000, your cost per transaction would be $10.

What percentage is a referral fee? ›

Agencies typically pay referral fees of 5% to 10% of the revenue they receive—but there's plenty of nuance on how you handle it, and many agencies pay 0% in referral fees.

What is a referral fee? ›

What is a referral fee? A referral fee is a commission paid to an individual who brings new customers to your business. Sometimes, businesses pay referral fees in exchange for a client introduction. But more often, a referral fee is tied directly to a sale.

How do you bill a project manager? ›

How to Charge for Project Management
  1. Charge an hourly rate for project management. ...
  2. Bill a flat rate by project. ...
  3. Charge a consulting or retainer fee that equals double or triple the hourly wage you'd make if a company employed you full-time. ...
  4. Send fee invoices to the client upon hitting project milestones.
26 Sept 2017

What are construction professional fees? ›

Typically professional fees are calculated based on a reducing sliding scale. The higher the project value, the lower the percentage fee. On a project under $1M, typical fee would be at 10-15%, between at $1-5M at 5-10%, between $5-10M at 3-5%, and for projects over $10M at 3% or lower excluding GST.

How much does a project manager build cost? ›

Architects often calculate their management fees as a percentage of the build costs (typically around 10% or so for a full service).

Should Project Managers be billable? ›

You can make a much better case for adding project management to your company if you consider it a billable task. Project managers allow developers and creatives to focus on what they do best. Meanwhile, the project manager manages the scope, timeline, and budget to help keep clients happy.

How do you bill clients monthly? ›

How to bill a client: An easy agency guide to more convenient...
  1. Set up clear expectations with a written contract. ...
  2. Develop an invoice template and make sure it includes contact info. ...
  3. Accept multiple forms of payment. ...
  4. Transfer clients to a retainer agreement with recurring payments.
7 Apr 2022

What is billing in PMO? ›

While almost every project has a cost and budget, Project Billing only comes to life when you have a paying Customer. So what is project revenue? At Easy Projects, we use the following definition: Project Revenue (Billing) is the total amount of money a Customer pays for a project.

What percent of a project cost is design? ›

The Department of Public Works' engineers and architectures expect design costs to make up approximately 7 percent to 15 percent of a project's costs, as a general rule.

How much does a major project cost on average to pay for design? ›

Engineering fees in the region of 1 to 2.5 percent of the construction cost are not uncommon, although this depends on the scope and complexity of the engineer's work. By comparison, you might fork out from 4.5 to 16 percent of the construction cost for an architect to provide a design concept.

Do project managers save money? ›

Generally, a good rule of thumb is that a successful project manager will save your company more on a project than the cost of their fees, which typically equate to 3% to 5% of the total cost of the project, depending on size and scope.

Is a project manager overhead? ›

No, project management is not overhead. Project management adds value by reducing waste and improving performance. Therefore project management is a value add.

How do I find a good project manager? ›

Here are a few criteria for selecting a good project manager:
  1. Project management experience. ...
  2. Project management education and certification. ...
  3. Personal and professional interests. ...
  4. Hiring an agency project manager. ...
  5. Hiring an in-house project manager. ...
  6. Hiring an industry-specific project manager. ...
  7. Step 1: Phone interview.
13 Sept 2019

Top Articles
Latest Posts
Article information

Author: Gov. Deandrea McKenzie

Last Updated:

Views: 6271

Rating: 4.6 / 5 (66 voted)

Reviews: 89% of readers found this page helpful

Author information

Name: Gov. Deandrea McKenzie

Birthday: 2001-01-17

Address: Suite 769 2454 Marsha Coves, Debbieton, MS 95002

Phone: +813077629322

Job: Real-Estate Executive

Hobby: Archery, Metal detecting, Kitesurfing, Genealogy, Kitesurfing, Calligraphy, Roller skating

Introduction: My name is Gov. Deandrea McKenzie, I am a spotless, clean, glamorous, sparkling, adventurous, nice, brainy person who loves writing and wants to share my knowledge and understanding with you.