Defining Steps for Starting an Integration Process (2024)

Use

An integration process is always started when a message is received. To receive the triggering message, use the receive step and set the Start Process indicator.

Procedure

  1. Insert the receive step to start a process as the first step of the process or as the first step of a fork, a block, or a loop.

    In the case of the latter, the fork, block, or loop must be the first step in the process.

  2. In the object area, define the container element that references the message that starts the process.
  3. Select this container element in the Message field in the properties area of the receive step.
  4. Select the Start Process field.
  5. In the Mode field, choose Asynchronous.
  6. If the process contains further receive steps, you can correlate their messages with the message from the first receive step. To do so, specify the correlations you want to activate in the Activate Correlations field.

    For each correlation you must specify how you want the elements of the correlation container to be filled when the correlation is activated. You can use the whole process container for this purpose.

    See: Correlation: Defining Assignment of Messages to Process Instances

Defining Steps for Starting an Integration Process (2024)
Top Articles
Latest Posts
Article information

Author: Manual Maggio

Last Updated:

Views: 6415

Rating: 4.9 / 5 (69 voted)

Reviews: 84% of readers found this page helpful

Author information

Name: Manual Maggio

Birthday: 1998-01-20

Address: 359 Kelvin Stream, Lake Eldonview, MT 33517-1242

Phone: +577037762465

Job: Product Hospitality Supervisor

Hobby: Gardening, Web surfing, Video gaming, Amateur radio, Flag Football, Reading, Table tennis

Introduction: My name is Manual Maggio, I am a thankful, tender, adventurous, delightful, fantastic, proud, graceful person who loves writing and wants to share my knowledge and understanding with you.