MRP Group

The MRP group contains all the materials from the point of view of MRP for assigning special control parameters for the total planning run. These control parameters include, for example, the strategy group, the consumption mode, and the planning horizon.

MRP Area

MRP Area represents a separate organizational area for which you can carryout MRP Separately.

An MRP area can include one or several storage locations of a plant or a subcontractor. You can define MRP areas within a plant.

By defining MRP areas, you can carry out MRP specifically for each area. This enables the right quantity of materials to be provided on time for each individual area, like, for example, a certain production line, a storage location for spare parts or subcontractor stock.

Regards,

Siva

Difference between MRP area and MRP group (2024)
Top Articles
Latest Posts
Article information

Author: Stevie Stamm

Last Updated:

Views: 6535

Rating: 5 / 5 (80 voted)

Reviews: 95% of readers found this page helpful

Author information

Name: Stevie Stamm

Birthday: 1996-06-22

Address: Apt. 419 4200 Sipes Estate, East Delmerview, WY 05617

Phone: +342332224300

Job: Future Advertising Analyst

Hobby: Leather crafting, Puzzles, Leather crafting, scrapbook, Urban exploration, Cabaret, Skateboarding

Introduction: My name is Stevie Stamm, I am a colorful, sparkling, splendid, vast, open, hilarious, tender person who loves writing and wants to share my knowledge and understanding with you.